Phase 1, Stage 8 Progress Report
(04.09.2001)

Click on picture to enlarge it. Use the back button to get back to this page or open in a new window.Or it may open in a new window. Just close it.

Stage 8. Construct a bund wall in the end of the new construction leaving the ends clear for eventual connection to further reconstruction.

{short description of image} {short description of image} {short description of image} {short description of image}
September 2001: Both walls of the canal are now taking shape. November 2004:All the groundwork is complete ready for the new bund. November 2004:The beginning of the bund. November 2004:Building the bund.
{short description of image} {short description of image} {short description of image} {short description of image}
November 2004:Half-way there. November 2004:
The first stage of the bund is complete.
November 2004:Putting bentomat onto the first stage of the bund. This will make it watertight. November 2004:Putiing soil over the bentomat to protect it.
{short description of image} {short description of image} {short description of image} {short description of image}
November 2004:The bentomat covered in soil. November 2004:Starting to put a protective mesh down the front of the bund. November 2004:The protective mesh. November 2004:Putting soil over the top of the protective mesh to ensure a good surface.
{short description of image}
November 2004:The finished bund. The canal now needs to be rewatered.