Phase 1, Stage 6 Progress Report
(22.07.2002)

Click on picture to enlarge it. Use the back button to get back to this page or open in a new window. Or it may open in a new window. Just close it.

Stage 6 is the footpath wall between the lock and the bridge. After setting out the line of the wall, excavation commenced and exposed the original canal wall. (see picture below) BW project Engineer, John Kearsey, has now decided that the old wall must be removed and a new wall built in its place.

{short description of image}
May 2001:
{short description of image}October 2001: {short description of image}December 2001 {short description of image}January 2002:
March 2002: {short description of image} June 2002: {short description of image} July: 2002{short description of image} July: 2002{short description of image}
July: 2002{short description of image} July: 2002{short description of image} OCT 2002{short description of image}