Phase 1, Stage 6 Progress Report
(22.07.2002)

Click on picture to enlarge it. Use the back button to get back to this page or open in a new window. Or it may open in a new window. Just close it.

Stage 6 is the footpath wall between the lock and the bridge. After setting out the line of the wall, excavation commenced and exposed the original canal wall. (see picture below) BW project Engineer, John Kearsey, has now decided that the old wall must be removed and a new wall built in its place.

To see an archive of the pictures of the work on this stage, click here

{short description of image} {short description of image}
May 2001: The public inspect the restoration work during the festival June 2002: The last wall section of stage 6 has been completed, and backfilling is progressing well during the festival

{short description of image}
Oct: 2002 The path has been laid with roadstone and rolled.