Phase 1, Stage 5 Progress Report

(03.9.2002)

Click on picture to enlarge it. Use the back button to get back to this page or open in a new window.Or it may open in a new window. Just close it.

Stage 5 is the towpath wall between the lock and the bridge currently in use as the footpath diversion and has to await completion of Stage 6.

To see an archive of the pictures of the work on this stage, click here

{short description of image} {short description of image}
August 2000: The filled in and overgrown canal between Little Tring Bridge and the pump house. Sep: 2002 Base 60 is poured and the formwork of base 61 is up.
{short description of image}
JAN:2005 The levelled towpath.