Phase 1, Stage 3 Progress Report
(02.12.2001)
Click on picture to enlarge it. Use the back button to get back to this page or open in a new window.Or it may open in a new window. Just close it.
Stage 3 is the formation (and subsequent removal just prior to final opening) of a bund in the stop lock to enable the ends of the lock to be exposed for connection to the new works. This was completed over the October weekend working party with the assistance of BITM and only requires some additional tipping to give sufficient width for diverting the towpath and footpath as necessary.
March 2005
![]() |
![]() |
![]() |
![]() |
| Removal of the bund starts | Steel piles are pulled out | More of the bund is removed | The steel frame which held the piles in place is removed |
![]() |
![]() |
| The spoil from the bund is put in the canal bottom | The bund is fully removed ready to water this section. |