Phase 1, Stage 7 2001 and 2002
Click on picture to enlarge it. Use the back button to get back to this page or open in a new window.Or it may open in a new window. Just close it.
Stage 7 Lay granular fill, HDPE liner and concrete overlay starting at, and working away from, the stop lock all the way through to the end of the new walls past the winding hole.
July 2002: |
|